CodeProject TitleClientStartEnd
P1299 Service contract for the technical assistance for the drafting of the basic UIC wide implementation project in the ADIF - Vilamalla freigth terminal station Code: B-TX-16240 and of the construction project of wide implantation UIC in the freigth terminal station ADIF - Vilamalla. Scope of the RFIG. Code: TX-16240.1 and of the construction project wide implantation UIC in the freigth terminal station ADIF - Vilamalla. Scope of Vilamalla freigth terminal. Code: TX-16240.2GISA - INFRAESTRUCTURES DE LA GENERALITAT DE CATALUNYA, S.A.U. 22/03/2017 21/08/2017
P1288 Consultancy for the Bidding of the Dhaka Metro (Bangladesh) Catenary and Traction Substation System Project. LARSEN & TOUBRO LTED 27/09/2016 30/11/2016
P1266 Detailed design for the LOCROS PROJECTELECTREN UK LIMITED 04/05/2016 31/05/2016
P1265 Lot no. 3: 25 kV/50Hz Electrification studies for the Southeast region unification for the following branches: -Ain M´lila-Tebessa -El Gourzi-Biskra -Biskra-TouggourtANESRIF 15/05/2016 15/06/2018
P1263 Maintenance and Renovation Technical advisor for the Finch West LRT Project (Toronto, ON)ACS INFRASTRUCTURE CANADA INC. 25/04/2016 25/10/2016
P1262 Lot no. 2: Electrification studies for 25 kv/50Hz for "Hauts Plateaux" reunification of the following branches: Saida-Moulay Slissen Saida-Tiaret Relizane-Tiaret-Tissemsilt Tissemsilt-Boughzoul Boughzoul-M´sila Ain Touta-M´sila-Bordj Bou ArreridjANESRIF 04/04/2016 04/11/2018
P1259 Electrification design services for ARUP in ManchesterOVE ARUP & PARTNERS LTD 03/05/2016 03/11/2016
P1258 Detailed design 25 kV/50Hz electrification in lot 4 of the Senia-Ain Temouchent Line (70km)ANESRIF 27/03/2016 27/06/2017
P1257 LOI for Designing Works for JNPT-Makarpura section of Western Dedicated Freight Corridor for electrical and mechanical Works, package 16 (EMP-16)LARSEN & TOUBRO LTED 30/03/2016 30/09/2019
P1245 Detailed design updates for electrification of SFM network Enllaç-Sa Pobla SERVEIS FERROVIARIS DE MALLORCA 01/01/2016 31/01/2016
P1236 Peer review on power consumption for Valley line LRT - STAGE 1 PROJECT (EDMONTON, AB) ACS - MERIDIAM - HOCHTIEF PPP - AECON - KEOLIS 07/10/2015 30/10/2015
P1234 Study of Power supply system on Pre-bid design consultancy Works of Western dedicated Frieght corridor-Rewari-Dadri Section CT P-14 projectLARSEN & TOUBRO LTED 04/10/2015 22/01/2016
P1229 Technical assistance in the tender bid preparation of the overhead contact line in Torrente-XátivaEMTE, SLU 13/08/2015 10/09/2015
P1226 Electrification for the HSL access to MurciaALDESA CONSTRUCCIONES, S.A. 06/08/2015 04/09/2015
P1225 Electrification of the railway line Dolynska – Mykolaiv – KolosivkaEIB (EUROPEAN INVESTMENT BANK) 15/09/2015 30/06/2016
P1220 Technical Assistance for Tender Preparation of Design, Supply, Installation, Testing and Commissioning of 2x25 kV Overhead Equipments, Traction Sub-Stations, Auxiliary Stations, Switching Stations, Auto Transformer Stations and SCADA system for JNPT - Makarpura (Vadodara) Section (approx. 422 Kms) Of Western Dedicated Freight Corridor (Phase – 2)LARSEN & TOUBRO LTED 17/07/2015 17/09/2015
P1209 Service contract for technical assistance in the catenary design for Network Rail workshops and depots OVE ARUP & PARTNERS LTD 08/06/2015 31/12/2015
P1208 Study for the tender bidding phase: “Empreitada de “Linha do Minho – Electrificaçao e Reabilitaçao do Troço Nine /Valença – Concenção/Construção de Sãubestação de Tração de Vila Fria, Postos Autotransformadores e de Zona Neutra”ISOLUX INGENIERIA S.A. 09/06/2015 17/07/2015
P1206 Elaboration of Preliminary Study for an alternative access to the Valencia Port Authority Principe Felipe Railway TerminaloAUTORIDAD PORTUARIA DE VALENCIA 01/06/2015 30/06/2015
P1205 Technical Assistance for the tender Design and construction electrified at 2x25 kV, and works associated with the double railway track line section: Mughalsarai - New Bhaupur (400 KM) of Eastern DFCC.ISOLUX INGENIERIA S.A. 28/05/2015 30/08/2015