P1299 Service contract for the technical assistance for the drafting of the basic UIC wide implementation project in the ADIF - Vilamalla freigth terminal station Code: B-TX-16240 and of the construction project of wide implantation UIC in the freigth terminal station ADIF - Vilamalla. Scope of the RFIG. Code: TX-16240.1 and of the construction project wide implantation UIC in the freigth terminal station ADIF - Vilamalla. Scope of Vilamalla freigth terminal. Code: TX-16240.2GISA - INFRAESTRUCTURES DE LA GENERALITAT DE CATALUNYA, S.A.U. 22/03/2017 21/08/2017
P1283 Technical Assistance for elaboration of the risk analysis and technical office services related to implementation of the Safety signs in the Spanish railway network.ADMINISTRACION DE INFRAESTRUCTURAS FERROVIARIAS 12/08/2016 12/09/2016
P1267 Track, turnout and infrastructure rehabilitation and maintenance for the "Algorta-Fray Bentos" railway sectionALDESA CONSTRUCCIONES, S.A. 09/05/2016 10/06/2016
P1266 Detailed design for the LOCROS PROJECTELECTREN UK LIMITED 04/05/2016 31/05/2016
P1262 Lot no. 2: Electrification studies for 25 kv/50Hz for "Hauts Plateaux" reunification of the following branches: Saida-Moulay Slissen Saida-Tiaret Relizane-Tiaret-Tissemsilt Tissemsilt-Boughzoul Boughzoul-M´sila Ain Touta-M´sila-Bordj Bou ArreridjANESRIF 04/04/2016 04/11/2018
P1261 Independent Safety Assessment (ISA) for modifications to the Llagosta interlockingTHALES ESPAÑA GRP, S.A.U. 04/04/2016 04/05/2016
P1258 Detailed design 25 kV/50Hz electrification in lot 4 of the Senia-Ain Temouchent Line (70km)ANESRIF 27/03/2016 27/06/2017
P1257 LOI for Designing Works for JNPT-Makarpura section of Western Dedicated Freight Corridor for electrical and mechanical Works, package 16 (EMP-16)LARSEN & TOUBRO LTED 30/03/2016 30/09/2019
P1252 Independent Safety Assessment (ISA) for modifications to the Viana de Cega interlocking softwareTHALES ESPAÑA GRP, S.A.U. 17/02/2016 29/06/2016
P1247 Consultancy services for the modernisation of the signalling system and operations control on the low density traffic lines on the ENR network.EGYPTIAN NATIONAL RAILWAY 23/05/2016 31/12/2016
P1245 Detailed design updates for electrification of SFM network Enllaç-Sa Pobla SERVEIS FERROVIARIS DE MALLORCA 01/01/2016 31/01/2016
P1243 ISA for modifications to the Quintanilleja-Burgos-Rosa de Lima-Rubena fork routeTHALES ESPAÑA GRP, S.A.U. 11/12/2015 31/03/2016
P1241 Independent Safety Assessment (ISA) for the interlock safety installation modifications at Caldes de Malavella as a result of platform heightening.THALES ESPAÑA GRP, S.A.U. 26/11/2015 14/03/2016
P1234 Study of Power supply system on Pre-bid design consultancy Works of Western dedicated Frieght corridor-Rewari-Dadri Section CT P-14 projectLARSEN & TOUBRO LTED 04/10/2015 22/01/2016
P1227 Structural integrity analysis for switch gear in Quesna THALES ESPAÑA GRP, S.A.U. 12/08/2015 04/09/2015
P1226 Electrification for the HSL access to MurciaALDESA CONSTRUCCIONES, S.A. 06/08/2015 04/09/2015
P1225 Electrification of the railway line Dolynska – Mykolaiv – KolosivkaEIB (EUROPEAN INVESTMENT BANK) 15/09/2015 30/06/2016
P1224 Valencia Port Authority study for maritime access. Alternative 1 for Príncipe Felipe de Valencia railway terminal accessAUTORIDAD PORTUARIA DE VALENCIA 01/08/2015 31/08/2015
P1221 Design drafting for the construction and works execution for additional measures for the civil protection and signalling installations in tunnels of the Barcelona-Figueres HSRLCOBRA INSTALACIONES Y SERVICIOS,SA 22/07/2015 06/08/2015
P1220 Technical Assistance for Tender Preparation of Design, Supply, Installation, Testing and Commissioning of 2x25 kV Overhead Equipments, Traction Sub-Stations, Auxiliary Stations, Switching Stations, Auto Transformer Stations and SCADA system for JNPT - Makarpura (Vadodara) Section (approx. 422 Kms) Of Western Dedicated Freight Corridor (Phase – 2)LARSEN & TOUBRO LTED 17/07/2015 17/09/2015